Sunday, 13 May 2012

Frame complete, roof has gone on..........................

Seen alot happen this week, framing complete considering the wheather has not been to good.

Windows have been installed, and roof tiles have been laid, with alittle disappointment that the roof has not been sharked. will ring our s/s tomorrow and ask why it hasnt been done. Hopefully he can do something about it and rectify the issue.

The timber windows look great and are very happy with what we chose. It seems such a long time ago since we chose all our fittings that you begin to doubt  what was choosen until you see them installed.

Roof tiles also look good after we were told that our orginal choice was unavaiable and had to choose another roof tile color.

Here are a few photos.........
                                         The view from front of house.
                                        

                                         The view from side of house.

                                         The bedroom terrace and alfresco.

                                         The view of living room, theater room from back of house.

                                         The view of side of house.
                                         Roof with sarking.
                                       
                                         The kitcthen looking into living room.

                                         The lounge room moved to front of house with study behind.

                                         View from front of house thru to living room.


                                         View from kitchen to front door.

Saturday, 5 May 2012

The frame is going up..................

Well its taken three weeks to get this far with the frame.

The wheather has not been to kind for us. its meant to be finished by the 2nd of may but as u can see its going slow...........and check out the pool of water we have in the kicthen and theres mud everywhere but hopefully it will get cleaned up once the roof is on.

Windows have been there for a coulpe of weeks also, so hopefully there not getting damaged with the rain. Spoke to carpenter and said they should be in on tuesday.


                                         view from front of house



                                          view from side of house
                                         

                                           
                                         windows on garage floor
                                  
                                        


                                         pool of water in kicthen


                                         view from kitchen into rear of house






                                       

                                         upstairs looking into main bedroom

Will update again soon...................lets hope the rain eases.
                                 

Friday, 20 April 2012

The slab and framing have begun................

In the last couple of weeks our home has progressed, and its starting to look like a house....

The slab has been laid and the framing has started.

here are a few pics............
















Friday, 30 March 2012

its all happening now.................

This week  alot has been done. we now have power and underground plumbing has started now awaiting slab to be prepared and poured.

It was so exciting to see it finally starting to build.............

                                                                      piering


                                                                    plumbing


                                                                    electrical


                                                    this is the rock they removed

                                              

Sunday, 25 March 2012

We have finally started...................

Its been a while since my last post but i guess nothing has really has happened!.

After delays with our site start, due to sytems upgrade at PD we have finally seen something happening,
no more a vacant block of land.

Got a call from our building co/ord on friday saying that we will be getting another building co/ord as she is moving to another department which is a shame because we had a good relationship, so now we will have to get to know our new building co/ord and hope this does not delay us anymore!

Meeting our site supervisor sometime this week and seems like a really nice guy over the phone  and has jobs booked in.

So lets hope its all go now...............



This is what we are hoping our home will look like....................



Waldorf 44 Sterling Facade. (as there is no display in the waldorf 44 in sterling facade)

Monday, 5 March 2012

Our Selections of our home...............

House selected: Waldorf  44

Facade:             Sterling
                                       Removed balustrade from windows
                                       deleted colonial bars from windows
                                       removed brickwork from balcony and added balustrade to balcony
                                       french doors to balcony
Slab:                  upgraded to H class waffle foundation

Energy rating:   R6.0 insulation batts to ceilings
                                        R 2.5 insulation batts and sisalation to walls

Hebel offer:       As per offer fully rendered home

Structural:        450 mm wide eaves to rest of house (upgrade)
                          projection wall in lounge room
                                      relocate lounge/ study
                                      2x 2040 x820 glass doors to study (upgrade)
                
Garage:            cedar timber section panel garage door (upgrade)

Windows:         All windows to house timber and stained (upgrade)

Doors:              All doors 2340mm high (upgrade)
                                      Doors to wirs to bedrooms (upgrade)
                                      Doors to theatre room/store room (upgrade)
                  
Roofing:           Georgian cat 3 (upgrade)

Plaster:

Cabinets:          3246mm long x 1100 island bench (upgrade)
                                      overhead cupboards extended to ceiling height (upgrade)
                                      cabinets in galley
                                      laminex crystal gloss (no handles to be put after handover)
Stone bench tops:cesarstone snow cat 3 (upgrade)

Appliances:       standard blanco hot plates
                                       2 x 60cm under bench blanco ovens in lieu of promotion

Security Systems: reliance 12 security system

Plumbing:

Heating & Cooling; brivis mx35i high efficiency heating unit
                                                  brivis contour l64 evap cooling
                                                  extra duct to master en suite

Stairs:                classic stair option 2 with carpet

Paint:                 3 coat paint system

Carpet:                cat 2

Tiling:                standard to all en suites 2/3/4
                                         upgrade to master en suite
                                         upgraded all living areas downstairs

                                         And heaps more!

please feel free to ask any questions that you may have.......................